Total cooling capacity = 280 ton (refrigeration)
Total electricity capacity = 2,000 kVA
Fire alarm and sprinkler systems covering all areas
Total water capacity = 40 cubic meters/day
Room Type |
Size |
Specifications |
---|---|---|
Office |
120 sq.m/room (6 rooms) |
Ceiling height = 3 m Floor load = 300 kg/sq.m Flooring tiles |
Meeting Room |
42 sq.m/room (2 rooms) |
Ceiling height = 3 m Floor load = 300 kg/sq.m Flooring tiles |
Pilot Area (include wet lab area in each module) |
Size S = 735 sq.m/module (6 modules) |
Normal electricity load ~ 3 Phase 200A (with kWh meter) Essential electricity load~ 3 Phase 200A (with kWh meter) Operation area on 1st floor : Ceiling height = 13 m Floor load = 2,000 kg/sq.m Polished floor Characterization lab on 1st floor : Wet lab on 2nd floor : Wet lab on 3rd floor : Ceiling height = 4.15 m Floor load = 500 kg/sq.m Polished floor |
Total cooling capacity = 280 tons (refrigeration)
Total electricity capacity = 1,600 kVA
Fire alarm and sprinkler systems covering all areas
Total water capacity = 40 cubic meters/day
Room Type |
Size |
Specifications |
---|---|---|
Office |
56 sq.m/room (5 rooms) |
Ceiling height = 3 m Floor load = 300 kg/sq.m Flooring tiles |
Meeting Room |
64 sq.m/room (2 rooms) |
Ceiling height = 3 m Floor load = 300 kg/sq.m Flooring tiles |
Pilot Area (include wet lab area in each module) |
Size M = 1,115 sq.m/module (2 modules) |
Normal electricity load ~ 3 Phase 320A (with kWh meter) Essential electricity load~ 3 Phase 320A (with kWh meter) Operation area on 1st floor : Ceiling height = 13 m Floor load = 10,000 kg/sq.m Polished floor Characterization lab on 1st floor : Ceiling height = 4.15 m Floor load = 500 kg/sq.m Polished floor Wet lab on 2nd floor : Ceiling height = 4.15 m Floor load = 500 kg/sq.m Polished floor Wet lab on 3rd floor : Ceiling height = 4.15 m Floor load = 500 kg/sq.m Polished floor |
Size L = 2,240 sq.m/module (1 module) |
Normal electricity load ~ 3 Phase 840A (with kWh meter) Essential electricity load~ 3 Phase 840A (with kWh meter) Operation area on 1st floor : Ceiling height = 13 m Floor load = 2,000 kg/sq.m Polished floor Characterization lab on 1st floor : Wet lab on 2nd floor : Wet lab on 3rd floor : Ceiling height = 4.15 m Floor load = 500 kg/sq.m Polished floor |
Total Cooling Capacity = 280 tons (refrigeration)
Total Electricity Capacity = 1,600 kVA
Fire alarm and sprinkler systems covering all areas
Total water capacity = 40 cubic meters/day
Room Type |
Size |
Specifications |
---|---|---|
Office |
64 sq.m/room (5 rooms) |
Ceiling height = 3 m Floor load = 300 kg/sq.m Flooring tiles |
Meeting Room |
42 sq.m/room (2 rooms) |
Ceiling height = 3 m Floor load = 300 kg/sq.m Flooring tiles |
Pilot Area (include wet lab area in each module) |
Size S = 710 sq.m/module (3 modules) |
Normal electricity load ~ 3 Phase 200A (with kWh meter) Essential electricity load~ 3 Phase 200A (with kWh meter) Operation area on 1st floor : Ceiling height = 13 m Floor load = 2,000 kg/sq.m Polished floor Characterization lab on 1st floor : Wet lab on 2nd floor : Wet lab on 3rd floor : Ceiling height = 4.15 m Floor load = 500 kg/sq.m Polished floor |
Size M = 1,095 sq.m/module (2 modules) |
Normal electricity load ~ 3 Phase 320A (with kWh meter) Essential electricity load~ 3 Phase 320A (with kWh meter) Operation area on 1st floor : Ceiling height = 13 m Floor load = 2,000 kg/sq.m Polished floor Characterization lab on 1st floor : Ceiling height = 4.15 m Floor load = 500 kg/sq.m Polished floor Wet lab on 2nd floor : Wet lab on 3rd floor : Ceiling height = 4.15 m Floor load = 500 kg/sq.m Polished floor |
Home
About EECi
Why EECi?
Vision & Mission
Location
Innovation Ecosystem
Our Growing Partners
Organization Chart
Contact Us
Focused Industries
Modern Agriculture & Advanced Biotechnology
Biofuels & Biochemicals
High Performance Battery & Modern Transports
Automation, Robotics, and Intelligent Electronics
Aviation & Space
Medical Devices
Incentives
Strategic Infrastructure
3-GeV Synchrotron Facility
Biorefinery Pilot Plant
Smart Manufacturing Center
Regulatory Sandbox
National Quality Infrastructure(NQI)
Rental Space
Utilities & Facilities
Main Building
Greenhouse & Plant Factory
Pilot Plant
Leasehold Land
Ecosystem
Talent
Testing
Facilities
Innovation Network
Quality of Life
Publication & Media
News
Factsheet
VDO
Brochure/Poster